Through the model
Lock the IFC model to the site with a printed marker board, then point the iPad at the wall. The steel frame, bracing and services in the model appear behind the lining at full size. This shows what was designed, in the position it was designed.
Through the record
Walk the job once a day with a 360 camera. Each frame is pinned to the plan by date. Later, stand at the wall, pick a date, and see that spot as the daily walk saw it before it was lined, poured or backfilled. This shows what was actually built, wherever the walk went.
Look back is planned. It comes after the daily 360 timeline.
What to capture before it is covered
- Services in walls and ceilings, before lining.
- Drainage, before backfill.
- Reinforcement, before the pour.
How accurate it is
The AR overlay is about ±10 to 20 mm near the marker after a good lock, and 50 to 100 mm or more at 20 to 30 m. Positions from 360 capture are within a few centimetres near good tags, and worse on long walks, bare walls or in poor light.
Use it to see whether something is there and roughly where it should be. It is not for tolerance sign-off.
Questions
Do I need a BIM model?
Not for the record. The 360 timeline works from a scaled, gridded floor plan. The AR overlay needs an IFC model.
Can it tell me exactly where a pipe is before I drill?
It shows where the model says the pipe is, to about ±10 to 20 mm near the marker, and what the walk recorded on the day. It is a visual check, not a substitute for locating services before you cut.
What equipment does it use?
An iPad Pro or iPhone Pro with LiDAR, printed A3 marker boards, a 360 camera such as an Insta360 X6 for the daily walk, and a Mac or Windows computer in the site office.
Is it available now?
The AR overlay is in site testing. The daily 360 timeline is next to be built, and Look back follows it. A pilot with two or three builders is planned.