How it works
- Walk the job. Wear the 360 camera on a hard hat and walk the site once a day.
- Plug it in at the site office. The computer checks the files before you leave. A 30-minute walk is 20 to 30 GB, and it never has to upload from site.
- It picks the frames. The sharpest frame in each half-second of video is kept, about one every half metre at walking pace, and blurred frames are rejected.
- It places them on the plan. The walking path is worked out from the video itself and tightened by the tags on the marker boards wherever they are seen. If the path drifts, drag it into place on the plan.
- Go back by date. Every frame is pinned to the plan by date, so you can open any spot on any day.
What it is for
Services, drainage and reinforcement are on record before they are lined, poured or backfilled. The record is the visual proof behind progress, payment and extension-of-time claims, and it becomes the handover record. Evidence packs for claims are a later phase.
You keep the record
The record is plain files in a job folder you hold. Camera files, photos, issues and check logs are kept as they were made, with file fingerprints and trusted timestamps behind every evidence pack.
A cloud layer for sharing and backup comes later, hosted in Australia. Sites that cannot put imagery in a third-party cloud can keep the folder in their own SharePoint.
How accurate it is
Positions are within a few centimetres near good tags, and worse on long walks, bare walls or in poor light. It is not for tolerance sign-off. Levels and survey points are taken with a GNSS rover or a level. The 360 footage is the visual proof.
Questions
Do I need a BIM model?
No. Capture, timeline, issues and evidence work from a scaled, gridded floor plan. An IFC model adds the AR overlay, element links and model comparison.
Does the footage go to the cloud?
No. Walks are processed on a Mac or Windows computer in your site office. A cloud layer for sharing and backup comes later, hosted in Australia.
Who owns the record?
You do. The record is plain files in a job folder you hold. Originals are never changed or deleted.
When will it be ready?
The daily 360 timeline is the next part to be built. A pilot with two or three builders follows it. Status as of November 2026.