How it works
- Load the model. Use an IFC model, or draw a massing yourself if the job has no BIM.
- Load the programme. MS Project, Primavera P6, Excel and CSV programmes are read.
- Set up the site. Place cranes, laydown areas, gates and exclusion zones.
- Run the job. Step through the programme and watch the building go up day by day.
- Take the plans. Produce a staged logistics plan for each stage of the job.
What it checks
- Crane reach and capacity for every lift, against the load chart.
- Deliveries, against the gates.
- Clashes with what is already standing, for every day of the programme.
Where it is up to
Constructability is built. ARKKEEP as a whole is being built and tested one phase at a time, at the desk first and then on site. Status as of November 2026.
Questions
Do I need a BIM model?
No. You can draw a massing of the building yourself and link that to the programme.
Which programme formats does it read?
MS Project, Primavera P6, Excel and CSV.
What does it produce?
Staged logistics plans, with cranes, laydown areas, gates and exclusion zones for each stage of the job.
Can I see it?
Yes. Email agent@arkkeep.com to ask for a demonstration.